Střecha na klíč / New roof
For new builds, we take over the property after the rough structure is complete and deliver a finished roof with downpipes and snow guards. The carpenter, roofer, and sheet metal worker operate on a single schedule, so you won't wait three weeks for cladding.
We use KVH timber or planed spruce timber with impregnation; joints according to the structural design. Truss roof for classic houses, beam roof for habitable attics without columns, nailed trusses for flat ceilings of bungalows. The roof structure is inspected before covering by the site foreman and the customer.
From the interior: plasterboard, vapour barrier, thermal insulation between and under rafters, safety diffusion foil, counter-battens (ventilated gap), battens, roofing material. Each layer has its function; omitting one will become apparent within two winters. For over-rafter insulation, the sequence changes and the beams remain visible.
Baked clay tiles for slopes from approximately 22 degrees, concrete tiles similarly, metal tiles from 12, standing seam sheet metal from 3 degrees, asphalt shingles from 15. We will include two roofing options in the quote so you can compare appearance and weight. The comparison is available on the page roofing materials.
Gutters and downpipes made from galvanised steel, titanium-zinc, copper or lacquered sheet metal; windbreak strips; flashing for chimneys and penetrations; snow guards according to the snow zone. On a new roof, sheet metal work is part of the contract, not an add-on.
Would you like to discuss this on site? Roof inspection and quotation are free throughout the Czech Republic. Send a request for a quote or call 775 654 443.
Ideally at the project stage to ensure the pitch, roofing material and roof truss load-bearing capacity are correct. No later than two months before completion of the rough construction so that materials arrive on site in time.
Yes. We will check the project, propose any necessary adjustments to the composition and adhere to the structural requirements. Any changes will be discussed with the designer.
Roof truss on a standard house takes one week; complete roof including sheet metalwork takes 2 to 3 weeks depending on complexity and weather.
Just a few details are needed. We will call you within 24 hours on working days to arrange an inspection appointment. The inspection and the quote are free and non-binding. Prefer to call? 775 654 443